The Certified Data Centre Expert (CDCE) training course, helps you prepare for the premier certification for data centre professionals in the data centre design/build and related fields.
In this five-day course, you will be provided with the skills to analyse a given business case and perform technical evaluation for a project plan and a set of designs for implementation of a mission-critical data centre. The course also engages participants in product evaluations and demonstrates how to select equipment and develop equipment test scripts (IET) and integrated performance and validation testing (IPVT). CDCE builds upon knowledge gained in CDCP and CDCS courses. Participants who pass the exam will join the industrys elite data centre project design experts.
After completion of the course the participant will be able to:
- Choose an optimum site for mission-critical data centres based on current and future needs.
- Describe all components important for high-availability in a data centre and how to effectively setup the data centre.
- Understand the design lifecycle stages for data centre build projects and the phases involved in project execution.
- Analyse a business case and develop a project brief that is aimed at fulfilling the business resilience, site selection and design requirements for a fit-for-purpose and suitably redundant mission-critical data centre.
- Conduct technical level design reviews for a given set of preliminary design documents and perform a technical compliance audit of a set of final design development documents compliant to TIA standards.
- Understand how to read electrical Single Line Diagrams (SLD) and other related design documents, and be able to detect the most common design mistakes.
- Evaluate product datasheets and discriminate amongst technical specifications and functional requirements for suitability against a set of given design requirements for a given site and business case.
- Correlate equipment specifications to site design constraints, such as room size and space, floor loading capacity, cooling capacity, power quality conditions and maintenance requirements while ensuring equipment selection does not compromise desired tier level compliance.
- Develop Individual Equipment Test (IET) and Integrated Performance Validation Test (IPVT) plans for a mission-critical data centre.
- Develop guidelines and checklists for the handover of a mission-critical data centre facility, its architectural, mechanical, electrical, IT elements and documentation.
- Develop retirement plans for decommissioning and handover of an aged mission-critical data centre facility
Module 1
Data Centre Life Cycle
- Data centre lifecycle stages and phases
- Exercise: Stage/Phase/Milestone/Document mapping
Module 2
Design Preparation
- Creation of a SON Statement Of Need Technology review
- Conceptual sizing
- How to calculate for computer room space How to calculate facility space
- How to calculate incoming power
- Exercise: Conceptual sizing building and power
- Analysing capacity of the existing facility
- Analysing investment options
- Site selection
- Permits and approvals
- Exercise: Site selection
- Conceptual design
- Budget and project timeline
- Business case preparation
- Project delivery structure
- Project management options
- Project manager and team
Module 3
Design Planning
- OSRA Operational Systems Requirement Analysis
- TFRA Technical Facilities Requirement Analysis
- Operations and maintenance review
- RFP Request For Proposal process
- Vendor selection
Module 4
Design Development
- Project planning
- Design development
- PDR Preliminary Design Review
- Equipment selection
- FDR/V Final Design Review/Validation
- Exercise: Full design validation of power, cooling, floor plans, fire suppression
- Design freeze and LLTI
- Creation of construction documents
- BOM/BOQ Bill Of Material/Bill Of Quantity
- Exercise: Equipment selection
Module 5
Acquire
- Requirements of purchase orders Shipping terms
- FWT/FAT Factory Witness Test/Factory Acceptance Test Sequencing
- Incoming goods inspection and handling Asset management
Module 6
Construct
- Temporary essential services
- Erection of the building
- Permanent essential services
- Building inspection
- Snag list
- COF Certificate Of Fitness
Module 7
Fit-Out
- Fit-Out
- Builders cleaning
- As-Built Drawings
Module 8
Test & Commissioning
- IET Individual Equipment Test
- IPVT/IST Integrated Performance Verification Test/ Integrated Systems Test
- Common mistakes with IET/IPVT Deep cleaning
- Exercise: IET/IPVT scripting
Module 9
Hand-Over
- Facility hand-over requirements and documents
- PCC Practical Completion Certi cate
- DLP Defect Liability Period
- Defect Management
- ICT Systems Installation
- ICT Systems Testing
- Hand-Over/DLP Expiry
- FCC Final Completion Certi cate
Module 10
Retirement
- Reasons and definitions of retirement Building the business case and project plan Sequencing
- Transfer of site Demolishing of site Legal matters
- FCC Final Completion Certificate
 EXAM: Certified Data Centre Expert
- The primary audience for this course is any IT, facilities or data centre professionals, who are involved in the design/build, renovation or relocation of a mission-critical data centre.
- Participants must hold a valid CDCS certificate in order to register for the CDCE class.